Understanding the Installation
Understanding Management and Power Cabling
Single-Switch Location Guidelines
Attach the Rails to the Switch
Attach Telco Adapters to the Rack Slides
Attach the Rack Slides to the Rack
Install the Switch Into the Rack
Install the Air Duct and Front Support
Attach Data and Management Cables
Prepare the Front Support and Small Air Duct
Verify the DHCP-Assigned IP Address and Host Name
Configure Network Management From the CLI (SER MGT)
Log Into the Oracle ILOM Web (NET MGT)
Log Into the Oracle ILOM CLI (NET MGT)
Log Into the Oracle ILOM CLI (SER MGT)
Change a SEFOS User Privilege Level
Configure Network Management From the Web Interface
Configure Network Management From the CLI
Log Out of the Oracle ILOM CLI
Configuring the SEFOS Environment
Configuring the Switching Feature
Configuring the Routing Feature
Check Switch Status (Oracle ILOM)
Enable or Disable the Incremental Save Flag
ESD Precautions
Installation Task Overview
Tools Needed for Installation
Understanding the Installation
Install the Air Duct and Front Support
Install the Fan Module
Install the Switch Into the Rack
Install the Air Duct and Front Support
Install a Power Supply
Installing the Switch
Install the Switch Into the Rack
Configure Network Management From the CLI (SER MGT)
Configure the Default IP Address
Configure the IP Address for an Interface
Verify the DHCP-Assigned IP Address and Host Name