Installing the Server Into a Rack
»
Connect AC Power Cables Before Installing ...
»
Install AC Power Cables and Slide-Rails
Updated: January 2021
Oracle
®
Server X5-2 Installation Guide
Document Information
Using This Documentation
Product Documentation Library
Feedback
Installation Procedure
Installation Procedure Overview
Preparing for Server Installation
Server Physical Specifications
Space Requirements
Receiving and Unpacking Guidelines
Maintenance Space Guidelines
Electrical Power Requirements
Facility Power Guidelines
Circuit Breaker and UPS Guidelines
Grounding Guidelines
Environmental Requirements
Temperature Guidelines
Humidity Guidelines
Ventilation and Cooling
Ventilation Guidelines
Agency Compliance
Shipping Inventory
Tools and Equipment Needed for Installation
ESD and Safety Precautions
Optional Component Installation
Server Features and Components
Server Components
Front Panel Status Indicators, Connectors, and Drives
Back Panel Status Indicators, Connectors, Drives, and PCIe Slots
Server Management
Multiple Server Management Tool
Single Server Management Tools
Oracle System Assistant
Oracle ILOM
Oracle Hardware Management Pack
Legacy BIOS and UEFI
Installing the Server Into a Rack
Installation Prerequisites
Rack Requirements
Safety Precautions
Rackmount Kit Contents
Stabilize the Rack for Installation
Install Mounting Brackets On the Server
Mark the Rackmount Location
Connect AC Power Cables Before Installing Tool-less Slide-Rails in Sun Rack II 1042
Install AC Power Cables and Slide-Rails
Attach Tool-less Slide-Rail Assemblies
Install the Server Into the Slide-Rail Assemblies
Install the Shipping Bracket With Cable Trough (Optional)
Install the Cable Management Arm
Remove the Cable Management Arm
Cabling the Server and Applying Power
Rear Cable Connections and Ports
Ethernet Ports
Preparing for Installation and Power On
Prepare to Install the Server
Connecting Cables and Power Cords
Connect Cables and Power Cords
Powering On the Server
Power On the Server
Connecting to Oracle ILOM
Oracle ILOM Service Processor and User Interfaces
Logging In or Out of Oracle ILOM
Log In to Oracle ILOM Using a Local Serial Connection
Log In to Oracle ILOM Using a Remote Ethernet Connection
Logging Out From Oracle ILOM
Log Out From Oracle ILOM
Modifying the Service Processor Network Settings Using Oracle ILOM
Modify Oracle ILOM SP Network Settings
Test the IPv4 or IPv6 Network Configuration
Redirecting the Host Console Using Oracle ILOM
Set the Mouse Mode
Redirect Host Server Desktop or Storage Devices Using Oracle ILOM
Access Serial Remote Host Console (CLI)
Troubleshooting Oracle ILOM
Reset the Service Processor Using Oracle ILOM
Reset the Service Processor From the Server Back Panel
Recover the Root Account Password
Setting Up Software and Firmware Using Oracle System Assistant
Launching Oracle System Assistant
Launch Oracle System Assistant Locally
Launch Oracle System Assistant Using the Oracle ILOM Web Interface
Configure Oracle System Assistant Networking
Preparing the Server for Operating System Installation
Setting Up an Operating System Using Oracle System Assistant
Setting Up Software and Firmware Using Oracle System Assistant
Perform Tasks Using Oracle System Assistant
Configuring Storage Drives for Operating System Installation
RAID Configuration Tools
RAID Limitations on Preinstalled Operating Systems
RAID Configuration Requirements
Configuring Storage Drives Into RAID Volumes Using Oracle System Assistant
Configure RAID on Storage Drives
Configuring RAID Using the BIOS RAID Configuration Utilities
Configure RAID in UEFI Boot Mode
Configure RAID in Legacy BIOS Boot Mode
Make a RAID Volume Bootable Using the LSI MegaRAID Configuration Utility
Configuring the Preinstalled Oracle Solaris Operating System
Preinstalled Oracle Solaris Image BIOS Boot Mode Restriction
Operating System Options
Oracle Solaris Configuration Worksheet
Configure the Preinstalled Oracle Solaris Operating System
Reinstalling the Oracle Solaris Operating System
Oracle Solaris Operating System Documentation
Configuring the Preinstalled Oracle Linux Operating System
Preinstalled Oracle Linux Image BIOS Boot Mode Restriction
Operating System Options
Oracle Linux Configuration Worksheet
Configure the Preinstalled Oracle Linux Operating System
Register and Update Your Oracle Linux Operating System
Oracle Linux Operating System Documentation
Configuring the Preinstalled Oracle VM Server Software
Preinstalled Oracle VM Server Image BIOS Boot Mode Restriction
Preinstalled Oracle VM Server Compatibility Requirements
Operating System Options
Oracle VM Server Configuration Worksheet
Configure the Preinstalled Oracle VM Server
Oracle VM Documentation
Getting Firmware and Software Updates
Firmware and Software Updates
Options for Accessing Firmware and Software Updates
Software Releases
Getting Updates From Oracle System Assistant or My Oracle Support
Download Firmware and Software Updates From My Oracle Support
Installing Updates Using Other Methods
Oracle Support
Controlling System Power
Powering the Host On and Off
Power Off the Host Using the Power Button
Power On the Host Using the Power Button
Power Host On and Off Using Oracle ILOM
Reseting the Server
Reset the Server Using Oracle ILOM
Troubleshooting Installation Issues
Troubleshooting and Diagnostics References
Technical Support Information Worksheet
Locating the System Serial Number
Site Planning Checklists
Preparation Checklists
Access Route and Data Center Checklist
Data Center Environment Checklist
Facility Power Checklist
Rackmount Checklist
Safety Checklist
Auto Service Request Checklist
Logistics Checklist
Index
Index A
Index B
Index C
Index D
Index E
Index F
Index G
Index H
Index I
Index L
Index M
Index N
Index O
Index P
Index R
Index S
Index T
Index U
Index V
Index W
Language:
English
Install AC Power Cables and Slide-Rails
Prior to installing the slide-rails into the rack, install right-angle AC power cables into the left-side and right-side PDU electrical sockets for the servers you are going to rack mount.
Install the slide-rails into the rack.
See
Attach Tool-less Slide-Rail Assemblies
.
Previous
Next