Facility Power Checklist
Complete the following checklist to ensure that the facility power requirements are met for
the data center in which the server is installed.
Table 15 Facility Power Checklist
|
|
|
|
|
Do you know the required operating voltage and electric current level of the server?
|
|
|
|
|
Are enough power outlets provided within 2 meters
(6.5 feet) for each rack?
|
|
|
|
|
Do the power outlets have appropriate socket receptacles?
|
|
|
|
|
Will optional ground cables be attached to the rack?
|
|
|
|
|
Are the circuit breakers for the equipment suitable in terms of voltage and current-carrying
capacities?
|
|
|
|
|
Does the power frequency meet the equipment specifications?
|
|
|
|
|
Will system power be delivered from two separate power grids?
|
|
|
|
|
Is there a UPS to power the equipment?
|
|
|
|
|
Do you have the minimum required power sources to support the power load for the new hardware?
Use kilowatt (kW)/kilovolt (kVA) to express power load.
|
|
|
|
|
|