Go to main content
Netra Modular System Installation Guide

Exit Print View

Updated: December 2016
 
 

Move the Modular System to the Installation Location

Ensure that there are clear pathways and enough clearance for moving the modular system from the unpacking area to the installation location. Verify that the entire access route to the installation site can support the system's weight and is free of raised-pattern flooring that can cause vibration.

  1. Verify that the installation site is ready.

    Caution

    Caution  -  A modular system with 20 nodes on a shipping pallet weighs 2,240 lbs (1,016 kg), so four people are required to move the modular system from the loading dock to the installation location. When completing a procedure, always communicate your intentions clearly before, during, and after each step to minimize confusion.


  2. Move the modular system from the loading dock to an air-conditioned site area near the installation location.

    See Unloading Route and Unpacking Area Requirements.

Related Information