Go to main content
Netra Modular System Installation Guide

Exit Print View

Updated: December 2016
 
 

Preparing for Installation

These topics describe requirements to prepare your site and your employees for the installation of the modular system.

Description
Link
Ensure that the system administrator and installers review the documentation.
Netra Modular System documentation at http://www.oracle.com/goto/netra-modular-system/docs
Verify that all space, electrical, temperature, and airflow requirements are met.
Review the installation task overview.
Prevent equipment damage and personal injury by understanding the modular system handling cautions.
Prevent damage to components by following the ESD precautions.
Perform these tasks before you connect the modular system and power it on.
Assemble the tools required for installation.

Related Information