Prepare the Modular System for Power

Perform the following tasks before you connect the modular system and power it on.

  1. Install a readily accessible disconnect device external to the modular system.
  2. Provide an overcurrent protective device that is external to the equipment.
  3. Choose an appropriate rating of an overcurrent protective device according to appropriate national and local electrical code or regulations.
  4. Verify the PDU rating identified on the compliance label as shown in Confirming Electrical and Power Requirements.
  5. Verify the plug rating as shown in PDU Power Requirements.

    This information will help you determine the appropriate overcurrent protection device.