Go to main content
Netra Modular System Installation Guide

Exit Print View

Updated: December 2016
 
 

Tools and Equipment Needed for Installation

To install this modular system, you must have the toolkit that shipped with the system, along with the following tools and equipment:

  • Wire cutters

  • 17-mm ramp wrench (attached to ramps inside the crate)

  • 17-mm wrench from the toolkit

  • 19-mm open socket wrench

  • No. 1 Phillips screwdriver

  • Torque wrench (not included with the modular system)

  • Drill

  • ESD mat and grounding strap

  • Hilti M12 HSL anchors (not included). If you plan to mount the modular system to a concrete floor with concrete anchors, you must purchase eight M12 concrete anchors.

In addition, you must provide a system console device, such as one of the following:

  • Laptop

  • ASCII terminal

  • Workstation

  • Terminal server

  • Patch panel connected to a terminal server

Related Information