Documentation, Support, and Training
Understanding Administrative Commands
Monitoring the InfiniBand Fabric
Controlling the InfiniBand Fabric
Understanding Signal Routing Through the Switch
Understanding Switch Startup and Component Addition
Understanding ILOM on the Switch
Switching Between the ILOM Shell and the Linux Shell
Controlling ILOM Targets (CLI)
Upgrading the Switch Firmware Through ILOM (CLI)
Administering ILOM (Web Interface)
Access ILOM From the Web Interface
Monitoring ILOM Targets (Web Interface)
Controlling ILOM Targets (Web Interface)
Upgrading the Switch Firmware Through ILOM (Web Interface)
Understanding InfiniBand Cabling
Understanding Switch Specifications
Understanding the Installation
Installing the InfiniBand Software Stack
Verifying the InfiniBand Fabric
Understanding Service Procedures
Servicing the Fabric Cards and Fabric Card Fillers
Servicing the InfiniBand Cables
Doing Supportive Software Tasks
Understanding Switch-Specific Commands
Performs CMC environmental test. Issued on the CMC.
env_test
This switch-specific command conducts a voltage and temperature test of the active CMC. The command output identifies nominal voltage, measured voltage, and temperature.
The following example shows how to perform the CMC environment test with the env_test command.
# env_test M9 CMC Environment test started: Measured 3.3V STBY = 3.30 V Measured 12V = 12.00 V Measured 1.2V STBY = 1.21 V Measured 1.2V = 1.22 V Measured 2.5V = 2.51 V Measured VBAT = 3.05 V Temperature at ADM1026 = 27 ÂșC M9 CMC Environment test PASSED #