L
M
- management cables
- attaching,
Attach the Management Cables
- requirements,
Management Cable Requirements
- management controller
- accessing,
Accessing the Management Controller
- network management,
Access the Management Controller From the Network Management Port
- USB management,
Access the Management Controller From the USB Management Port
firmware
- upgrading,
Upgrading the Firmware
- version,
Display Switch Firmware Versions
restarting,
Restart the Management Controller
- managementreset command,
Restart the Entire Switch
- mapping
- CXP to switch chip port,
CXP Connectors and Link LEDs to Switch Chip Port Routes
- GUID
- to CXP connector,
Locate a Switch Chip or Connector From the GUID
- to switch chip,
Locate a Switch Chip or Connector From the GUID
LED to switch chip port,
CXP Connectors and Link LEDs to Switch Chip Port Routes
- LIDs to GUIDs,
Map LIDs to GUIDs
- switch chip port
- to CXP,
Switch Chip Port to CXP Connectors and Link LED Routes
- to LED,
Switch Chip Port to CXP Connectors and Link LED Routes
- to switch chip port,
Switch Chip Port to Switch Chip Port Routes
- monitoring
- hardware,
Monitoring the Hardware
- InfiniBand fabric,
Monitoring the InfiniBand Fabric
N
O
P
- paddle boards,
Identify the InfiniBand Cable
- password,
Change the Administrator Password
- perfquery command,
Display Counters for a Node
- physical specifications,
Physical Specifications
- poor performing links,
Find 1x or SDR or DDR Links in the Fabric
- port
- checking,
Check All Ports
- disabling,
Disable a Port
- enabling,
Enable a Port
- information,
Display Low-Level Detailed Information About a Port
- resetting,
Reset a Port
- speed,
Set Port Speed
- status,
Display Switch Chip Port Status
- power cord
- attaching,
Attach the Power Cords
- requirements,
Power Cord Requirements
- power supply
- checking
- LEDs,
Check Power Supply Status LEDs
- status,
Display Power Supply Status
features,
Identify the Power Supply
- inspecting,
Inspecting a Power Supply
- connectors,
Inspect the Power Supply Connectors
- hardware,
Inspect the Power Supply Hardware
installing,
Install a Power Supply
- LEDs,
Front Status LEDs
- powering
- off,
Power Off a Power Supply
- on,
Power On a Power Supply
removing,
Remove a Power Supply
- servicing,
Servicing the Power Supplies
- powering off
- power supply,
Power Off a Power Supply
- switch,
Power Off a Power Supply
- powering on
- power supply,
Power On a Power Supply
- switch,
Powering On the Switch
- preparation,
Installation Preparation
- problem
- hardware,
Switch Hardware Problems
- InfiniBand fabric,
InfiniBand Fabric Problems
R
- rear status LEDs,
Rear Status LEDs
- reboot command,
Restart the Management Controller
- recovering switch chip ports,
Recover Ports After Switch Chip Reset
- recovery errors,
Determine Which Links Are Experiencing Significant Errors
- removing
- fan,
Remove a Fan
- InfiniBand cable,
Remove an InfiniBand Cable
- power supply,
Remove a Power Supply
- switch from rack,
Remove the Switch From the Rack
- replaceable components,
Replaceable Components
- replacing the battery,
Replace the Battery
- resetting
- port,
Reset a Port
- switch chip,
Reset the Switch Chip
- restarting
- entire switch,
Restart the Entire Switch
- management controller,
Restart the Management Controller
- retraction strap,
Identify the InfiniBand Cable
- root node GUID file,
Create the guid.txt File
- route
- CXP to switch chip port,
CXP Connectors and Link LEDs to Switch Chip Port Routes
- switch chip port to CXP,
Switch Chip Port to CXP Connectors and Link LED Routes
- switch chip port to switch chip port,
Switch Chip Port to Switch Chip Port Routes
- through switch
Understanding Routing Through the Switch
Signal Route Through the Switch
- through the fabric,
Display a Route Through the Fabric
- routing
- InfiniBand cables,
Understanding InfiniBand Cabling
- service cables,
Routing Service Cables