Go to main content
Sun Server X4-8 Installation Guide

Exit Print View

Updated: December 2015
 
 

Unpack the Server and Inventory the Contents

Use these instructions to remove the server from its container and inventory the contents.

The following items should be packaged with the Sun Server X4-8:

  • Power cords, packaged separately with country kit

  • Rackmount kit containing shelf rails and installation instructions

  • Miscellaneous hardware and cables

  • Sun Server X4-8 Getting Started Guide

  • Legal and safety documents

Required server components and most options are installed at the factory. However, some ordered options might be packaged separately.

Before You Begin

This procedure requires a lift.


Caution

Caution  -  Equipment damage or personal injury. Do not attempt to install the server without a lift.


  1. Inspect the shipping cartons for evidence of physical damage.

    If a shipping carton appears damaged, request that the carrier's agent be present when the carton is opened. Keep all contents and packing material for the agent's inspection.

  2. Open the top of the box.
    1. Cut the straps.
    2. Cut or remove the tape.
    3. Open the flaps.

    image:Picture of shipping container components and the order of                             unpacking.
  3. Remove the rack mounting kit (1) and set it and its contents aside.
  4. Remove the tray (2) and set it aside.
  5. Lift the box (3) up and away from the server.
  6. Remove the foam inserts (4).
    1. Fold the corrugated flap down to release the front foam insert.
    2. Remove the front and rear inserts.
  7. Remove the anti-static wrapper from the server.
  8. To remove the server from the pallet, insert the blades of the lift in the gap between the server and the pallet.

    For rack mounting instructions, see Rack Installation Instructions.

    Callout
    Description
    1
    Rack mounting kit
    2
    Tray
    3
    Box
    4
    Foam inserts
    5
    Server
    6
    Pallet