Caution

Caution  -  Do not attempt to move the server alone without a lift. For a one-person installation, all the main CRUs must be removed, and a lift must be used. For a two-person installation, all the CRUs must be removed, and a lift is optional.


  1. Prior to installing the server, confirm that you have removed the following components.
    • Both processor modules

    • The main module

    • All four power supplies

    • All five fan modules

    Refer to the SPARC T8-4 Server Service Manual for removal instructions.

  2. If you are using a mechanical lift, ensure that the lift is level and stable.
  3. Lift the server up to the correct height.

    Ensure that the bottom edge of the server has cleared the bottom of the shelf rails.

  4. Slide the server into the rack.
    image:Installing the server with a mechanical lift.
  5. Secure the server to the front panel using four No. 2 Phillips screws.
  6. Replace all of the components that you removed.
    • Both processor modules

    • The main module

    • All four power supplies

    • All five fan modules

    Refer to the SPARC T8-4 Server Service Manual for installation instructions.