SPARC T8-4 Server Installation Guide

Exit Print View

Updated: September 2017
 
 

Determine Correct Rackmount Hardware

  1. Ensure that the rack is stabilized.

    See Stabilize the Rack.

  2. Determine the hardware needed for your rack installation.
    Rack Type
    Fastener Bags Required
    Square hole
    SCREW, SEMS, M6 X 16
    CAGE NUTS, M6
    Round hole (10-32) with corner bezel
    SCREW, SEMS, 10-32 X 10
    SCREW, FLAT HEAD, M4 X 10
    Round hole (M6) with corner bezel
    SCREW, SEMS, M6 X 12
    SCREW, FLAT HEAD, M4 X 10
    Round hole (10-32) inside installation
    SCREW, SHOULDER, 10-32
    SCREW, FLAT HEAD, M4 X 10
    Round hole (M6) inside installation
    SCREW, SEMS, M6 X 12
    SCREW, FLAT HEAD, M4 X 10

    Note -  Some of the fastener bags that are included in the kit are not required to install this server.
  3. Mark the rackmounting location.

    See Mark the Rackmounting Location.