Access Route
and Data Center Checklist
Review the following facility requirements before installing the server.
Table 13 Access Route and Data Center Room Checklist
|
|
|
|
|
Has the access
route been checked for clearances of the packaged equipment? |
|
|
|
|
Do all the
doors and entry ways conform to the width and height requirements
for transportation, including the width of the unpacked unit? |
|
|
|
|
Are there any
ramps, stairs, or thresholds that are in the moving path for the
new hardware? |
|
|
|
|
Have you confirmed
that the access route is free of any obstacles that would expose
the device to shock? |
|
|
|
|
If there are
stairs, then is a loading elevator accessible for moving the equipment? |
|
|
|
|
Has the rack location been allocated? |
|
|
|
|
Is there a vacant space in the rack for the new server? |
|
|
|
|
Does the floor
layout meet the equipment maintenance access requirements? |
|
|
|
|
Is there adequate
space available for server maintenance? |
|
|
|
|
Have cabinet
stabilization measures been considered? |
|
|
|
|
Will the hardware
location require any non-standard cable lengths? |
|
|
|
|
Is the floor to ceiling height a minimum of 2.9 meters (9.6 feet)? |
|
|
|
|
Is the depth of the raised
floor a minimum of 460 mm (18 inches)? |
|
|
|
|
|