Preparing for Installation
These topics describe requirements to prepare your site and your employees for the
installation of the modular system.
|
|
Ensure that the system administrator and installers review the
documentation.
|
|
Verify that all space, electrical, temperature, and airflow
requirements are met.
|
|
Review the installation task overview.
|
|
Prevent equipment damage and personal injury by understanding the
modular system handling cautions.
|
|
Prevent damage to components by following the ESD precautions.
|
|
Perform these tasks before you connect the modular system and power it
on.
|
|
Assemble the tools required for installation.
|
|
|