Installation Task Overview
This is a summary of the high-level tasks you perform to install the modular system at your site, and power it on for the first time.
|
|
|
1
|
Review the product notes for late-breaking news about the modular
system.
|
|
2
|
Familiarize yourself with the modular system features and
components.
|
|
3
|
Read the requirements and safety precautions.
|
|
4
|
Receive the modular system.
|
|
5
|
Move the modular system to the final location.
|
|
6
|
Unpack the modular system.
|
|
7
|
Install additional compute nodes.
|
|
8
|
Secure the modular system.
|
|
9
|
Connect the modular system.
|
|
10
|
Power on the modular system.
|
|
11
|
Perform troubleshooting.
|
|
|