Battery Service Sequence


Note -  You must completely power off the gateway before disconnecting the data cables. Similarly, you must attach all data cables before powering on the gateway.
Step
Description
Links
1.
Determine if the battery is faulty.
“Determine If the Battery is Faulty” on page 79
2.
Power off both power supplies.
“Power Off a Power Supply” on page 48

Note -  Do not remove the data cables until the gateway is powered off.

3.
Remove all data cables.
“Remove a Data Cable” on page 70
4.
Remove the gateway from the rack.
“Remove the Gateway From the Rack” on page 81
5.
Replace the battery.
“Replace the Battery” on page 82
6.
Install the gateway in the rack.
Gateway Installation, installing the gateway

Note -  Do not power on the gateway.

7.
Install all data cables.
“Install a Data Cable” on page 75
8.
Power on both power supplies.
“Power On a Power Supply” on page 53
9.
(Optional) Set the time and date.
Gateway Administration, setting the date and time