Go to main content

Oracle® Rack Cabinet 1242 User's Guide

Exit Print View

Updated: June 2021
 
 

Installation Task Overview

Follow these general steps when preparing to position, stabilize, and ground the rack.

Steps
Description
Links
1.
Unpack the rack.
2.
Move the rack to the installation site.
3.
Stabilize the rack.
4.
Locate the top cable window.
5.
(Optional) Attach a grounding strap.

Related Information