Go to main content

Oracle® Rack Cabinet 1242 User's Guide

Exit Print View

Updated: June 2021
 
 

Rack Task Installation Overview

Follow these general steps when installing a rack at an installation site.

Step
Description
Links
1.
Review all safety warnings and guidelines.
2.
Review the features of the Oracle Rack Cabinet 1242.
3.
Review the rack dimensions and requirements.
4.
Prepare the installation site.
5.
Unpack and install the rack.
6.
Install PDUs into the rack, if not already installed at the factory.
If your PDUs were preinstalled at the factory, see Prepare Factory-Installed PDUs.
Otherwise, refer to the Oracle Rack Cabinet 1242 Power Distribution Units User's Guide, or your third-party PDU documentation, for instructions.
7.
Install and cable rackmountable equipment into the rack.
8.
Install the optional components.

Related Information