Exit Print View
These topics describe how to position, stabilize, and ground the rack.
Installation Task Overview
Rack Packaging
Tools Required
Move the Rack to the Installation Site
Stabilize the Rack (Leveling Feet)
Understanding the Rack
Confirming Specifications
Preparing for Rack Installation
Installing PDUs
Preparing to Install or Service Equipment
Returning the Rack to Operation
Servicing the Rack
Repacking a Rack for Shipment