Go to main content

Sun Rack II User's Guide

Exit Print View

Updated: July 2018
 
 

Install the Doors

  1. Retrieve the doors and carefully place them on the door hinges one end at a time.

    Note -  Ensure that you insert the longer pin into the bottom gudgeon. Then insert the top hinge into the top gudgeon. See Remove the Doors for the location of these door hinge gudgeons.
  2. Connect the front and rear door grounding straps to the doors.

    Depending on the type of installed equipment in the rack, each door might have one or two grounding straps.


    image:Figure showing how to attach grounding straps to the                                 door.
  3. Close both doors.
  4. (Optional) Lock both doors.

    The door keys are in the shipping kit.


    Note - For the new racks, a single key is used for both door lock and side panel locks.

    Note - For the new racks, the lock cylinder is interchangeable, and you can customize it.

    image:Figure showing interchangeability of the lock cylinder.