Retrieve the doors and carefully place them on the door hinges
one end at a time.
Note -
Ensure that you insert the longer pin into the bottom gudgeon. Then
insert the top hinge into the top gudgeon. See Remove the Doors for the
location of these door hinge gudgeons.
Connect the front and rear door grounding straps to the doors.
Depending on the type of installed equipment in the rack, each door might
have one or two grounding straps.
Close both doors.
(Optional) Lock both doors.
The door keys are in the shipping kit.
Note - For the new racks, a single key is used for both door
lock and side panel locks.
Note - For the new racks, the lock cylinder is interchangeable,
and you can customize it.