Go to main content

SPARC T5-8 Server Installation Guide

Exit Print View

Updated: October 2015
 
 

Prepare the Server


Caution

Caution  -  Do not attempt to move the server alone without a lift. For a one-person installation, all the components must be removed and a lift must be used. For a two-person installation, all the components must be removed and a lift is optional.


  1. Remove the server from the box.

    See Shipping Kit (Part Number 350-1662-02).

  2. Remove all of the processor modules, the main module, the power supplies, the fan modules, and the PCIe card carriers from the server.

    Refer to the service manual for detailed instructions.

  3. Determine your next step:
    • For a one-person installation, place the server on a mechanical lift.
    • For a two-person installation, place the server on a mechanical lift if one is available.
  4. Install the server in the rack.

    See Installing the Server.

Related Information