Table of Contents
- Title and Copyright Information
- About This Guide
- 1 Safety
- 2 Component Overview
- 3 Graphic Display
-
4
System Installation
- Shipped Parts
- Pre installation
- Mounting Installation
- Cabinet-Style 4-Post Chassis Installation
- Center-Mount 2-Post Chassis Installation
- Fan Module Installation
- Ground and Power Cable Installation
- Cabling the Acme Packet 6300/6350 System
- Cabling for HA Deployments
- 5 Startup
-
6
Maintenance
- System Shut Down
- Rebooting, Resetting, and Power Cycling
- Standby Mode for HA Nodes
- Chassis Removal
- ESD
- Power Supply Removal and Replacement
- NIU/TCU Removal and Installation
- Replacing the SSM3 Module
- Replacing Transcoding Modules
- Replacing the SSD
- Fan and Filter Maintenance
- SFP+ Removal and Replacement
- SFP+ Media Signaling Interfaces
- Media Cables
- Removing an SFP+
- Alarms
- 7 Specifications
- 8 Acronyms, Definitions, and Terms