Go to main content
Netra Modular System Service Manual Supplement

Exit Print View

Updated: December 2016
 
 

Tools Needed for Servicing a PDU

Prior to installing a standard PDU into your modular system, prepare the work area and assemble the following tools:

  • T-25 Torx wrench key (included in the modular system shipping kit)

  • T-30 Torx wrench key (included in the modular system shipping kit)

  • M5 shipping screws and washers (included in the PDU shipping kit)

  • M12 torque wrench and M12 concrete bolts, such as Hilte M12 HSL-3-B anchors, if you need to move a modular system that is anchored to the floor.

  • No. 3 Phillips screwdriver

  • Cordless drill and matching T-25 and T-30 drill bits

Also, you must supply:

  • Antistatic wrist strap

  • Tie wraps

  • Clean antistatic work table, or area, near the modular system

Related Information