Route the Power Cords and Management Cables
The facility power receptacles for the power cords should be located such that the
power cords are routed out of the way.
-
Identify the prerequisite and subsequent installation tasks that you must
perform in conjunction with this task.
See Installation Task Overview.
-
Route the female end of the power cords up from the power distribution panel
or receptacles at the rear of the rack.
-
Route the network management cable and serial management cable (if a full-time
serial management cable will be used) from their respective hubs, concentrators,
or switches, to the rack.
-
Route the cords and management cables to the left rear side where you are
installing the switch.
-
Add at least 8 inches of slack to the cable lengths to enable connection and
disconnection with the switch power receptacles, the SER MGT connector, the
PrizmMT connectors, and the RJ-45 connectors.
-
Secure the cables to the rack mounting location with this additional slack.
Use hook and loop fastener straps to bundle and secure the cables.
-
Install the switch.
See Install the Switch.