Go to main content
Oracle® Fabric Interconnect F2-12 Installation Guide

Exit Print View

Updated: November 2016
 
 

Stabilize the Rack


Caution

Caution  -  To reduce the risk of personal injury, stabilize the rack and extend all anti-tilt devices before installing the switch.


  1. Identify the prerequisite and subsequent installation tasks that you must perform in conjunction with this task.

    See Installation Task Overview.

  2. Open and remove the front and rear doors from the rack.
  3. If there are leveling feet beneath the rack to prevent it from rolling, extend these leveling feet fully downward to the floor.
  4. Fully extend the rack's anti-tilt legs or anti-tilt bar, which are located at the bottom front of the rack.
  5. Mark the rack to where the switch will install.

    See Mark the Rack.

Related Information