List of Tables
- 1-1 Acronyms
- 1-2 Definitions
- 1-3 Example of a step that indicates the server on which it needs to be executed.
- 1-4 Example of a step that needs to be executed on both MPS A and MPS B servers.
- 1-5 User Password Table
- 2-1 Install paths
- 2-2 System Configuration Information
- 2-3 User Password Table
- 2-4 Installation Phases
- 3-1 Full upgrade paths for APPD
- 3-2 Timeline table for Full upgrade preparation
- 3-3 Timeline table for Full upgrade of ELAP
- 3-4 Maintenance Window Tasks
- 3-5 Procedure 1 SETTING UP UPGRADE ENVIRONMENT
- 3-6 Procedure 2 CAPTURING E5-APP-B CURRENT CONFIGURATIONS
- 3-7 Procedure 3 PRE-UPGRADE HEALTH CHECK
- 3-8 Procedure 4 LSMS SERVDI BACKUP
- 3-9 Procedure 5 BACKUP EUIDB
- 3-10 Procedure 6 DISCONNECT ELAP FROM LSMS
- 3-11 Procedure 7 IPM MPS SERVER WITH TPD 8.10.X
- 3-12 Procedure 8 PRE-INSTALL CONFIGURATION
- 3-13 Procedure 9 INSTALL THE ELAP APPLICATION
- 3-14 Procedure 10 CONFIGURE NETWORK’INTERFACE USING PLATCFG UTILITY
- 3-15 Procedure 11 Switch Configuration
- 3-16 Procedure 12 CONFIGURE CHRONY SERVERS
- 3-17 Procedure 13 INITIAL NETWORK CONFIGURATION
- 3-18 Procedure 14 VERIFY CONFIGURATIONS
- 3-19 Procedure 15 TRANSFER DATABASES TO MATE
- 3-20 Procedure 16 RESTORE EUIDB
- 3-21 Procedure 17 SSH KEY EXCHANGE BETWEEN THE ELAP AND LSMS
- 3-22 Procedure 18 RE-POINT LSMS TO ELAP VIP
- 3-23 Procedure 19 TRANSFER SERVDI BACKUP TO ELAP
- 3-24 Procedure 20 RESTORE SERVDI BACKUP
- 3-25 Procedure 21 POST FULL UPGRADE SYSCHECK
- 3-26 Procedure 22 ACCEPT THE UPGRADE
- 3-27 Procedure 23 DETERMINE IF UPGRADE OR INSTALLATION IS REQUIRED
- 3-28 Procedure 24 VERIFYING AND CAPTURING REQUIREMENTS
- 3-29 Procedure 25 SM CARDS - CABLE MIGRATION AND DB RELOAD
- 4-1 DUAL IMAGE UPGRADE OVERVIEW
- 4-2 Full upgrade paths for E5APPB-02
- 4-3 System Configuration Information
- 4-4 User Password Table
- 4-5 DIU upgrade Phases
- 4-6 Backout Procedure Overview
- 4-7 Procedure 26: Determine Whether a DIU Upgrade Is Required
- 4-8 Procedure 27: Verify and Capture Requirements
- 4-9 Procedure 28: Perform a System Health Check
- 4-10 Procedure 29: Assess MPS Server Readiness
- 4-11 Procedure 30: Check the Pre-Upgrade System Date and Time
- 4-12 Procedure 31: Back Up the RTDB
- 4-13 Procedure 32: Perform the DIU Upgrade
- 4-14 Procedure 33: Accept or Reject the Dual Image Upgrade
- A-1 TELCO TO CISCO SWITCH REPLACEMENT
- A-2 CISCO SWITCH CONFIGURATION
- A-3 E5-APP-B to APPD Card Replacement.
- B-1 APPENDIX B. ISO IMAGE COPY FROM USB MEDIA
- C-1 APPENDIX C. VALIDATE ISO IMAGE
- D-1 APPENDIX D. DISCONNECT NPAC FROM LSMS
- E-1 APPENDIX E. CONNECT NPAC TO LSMS