Do you have contact information for the data center personnel?
|
|
|
|
|
Is a mechanical lift available?
|
|
|
|
|
Is the route free of raised tiles or other
obstructions?
|
|
|
|
|
Is there security or access control for the data
center?
|
|
|
|
|
Are there any security background checks or security
clearances required for vendor personnel to access the data
center? If yes, then do you have a recommended agency?
|
|
|
|
|
How many days in advance must background checks be
completed?
|
|
|
|
|
Are there any additional security access issues?
|
|
|
|
|
Is computer room access available for installation
personnel?
|
|
|
|
|
Are laptops, cell phones, and cameras allowed in the data
center?
|
|
|
|
|
Does the building have a delivery dock?
|
|
|
|
|
Is there a delivery/unpacking/staging area?
|
|
|
|
|
Is the delivery inside?
|
|
|
|
|
If the delivery is not inside, then is the site prepared for
uncrating?
|
|
|
|
|
Is the unpacking/staging area protected from the
elements?
|
|
|
|
|
Does the building have adequate receiving space?
|
|
|
|
|
Is the unpacking area air-conditioned to avoid thermal shock
for various hardware components?
|
|
|
|
|
Will sufficient moving personnel be available to install the
hardware?
|
|
|
|
|
Are you prepared for uncrating and trash removal?
|
|
|
|
|
Are there any restrictions on delivery and trash
removal?
|
|
|
|
|
Are there any restrictions on delivery truck length, width or
height?
|
|
|
|
|
Are cardboard boxes and other packing material allowed in the
computer room?
|
|
|
|
|
Is there a time constraint on dock access? If yes, then
provide time constraints.
|
|
|
|
|
Is tail lift required on delivery carrier to unload the
equipment at the delivery dock?
|
|
|
|
|
Will any of the following be required to place equipment in
computer room?
Stair walkers
Lifters
Ramps
Steel plates
Floor covers
|
|
|
|
|
Does the delivery carrier require any special equipment, such
as non-floor damaging rollers, transport dollies, pallet jacks,
or fork lifts?
|
|
|
|
|