Go to main content

Oracle® Server X7-8 Installation Guide

Exit Print View

Updated: April 2018
 
 

Facility Power Checklist

Complete the following checklist to ensure that the facility power requirements are met for the data center in which the server will be installed.

Facility Power Considerations
Yes
No
N/A
Comment
Do you know the required operating voltage and electric current level of the device and peripherals?
Are enough power outlets provided within 2 meters (6.5 feet) for each rack?
Do the power outlets have appropriate socket receptacles?
Will optional ground cables be attached to the rack?
Are the circuit breakers for the equipment suitable in terms of voltage and current-carrying capacities?
Does the power frequency meet the equipment specifications?
Will system power be delivered from two separate grids?
Is there a UPS to power the equipment?
Do you have the minimum required power sources to support the power load for the new hardware? Use kilowatt (kW)/kilovolt (kVA) to express power load.

Related Information