Use the following guidelines for grounding the server:
Use grounding-type power cords for the rack that are compatible with the Oracle Server X7-8.
Always connect the cords to grounded power outlets.
Because different grounding methods are used, depending on location, verify the grounding type. For the correct grounding method, refer to local electrical codes.
Ensure that the facility administrator or qualified electrical engineer who verifies the grounding method for the building also performs the grounding work.