Go to main content
Index
A
- access route guidelinesAccess Route
Guidelines
- airflow guidelinesAirflow
Precautions
- airflow requirements
- 1042Sun Rack
II 1042 Weights
- 1242Sun Rack
II 1242 Weights
- antistatic wrist strap
- attachingAttach an Antistatic Wrist Strap
- requirementsESD Precautions
- antitilt legs
- extendingExtend the Antitilt Legs
- retractingRetract the Antitilt Legs
C
- cable
- management hooksInstall a Cable Management Hook
- spring nuts, installingInstall a Cable Management Hook
- routing
- brackets, PDUPrepare Factory-Installed PDUs
- space dimensionsRear Cabling
Space (Sun Rack II 1042)
- cabling
- floor cutout
- 1042 dimensions
- Cable Routing Holes
- Cable Routing Holes
- 1240 dimensions
- Floor Cutout Dimensions (Original Sun Rack II 1242)
- Floor Cutout
Dimensions (Enhanced Sun Rack II 1242)
- preparingCable Routing Holes
- grounding cableAttaching a Grounding Cable
- management hooksInstall a Cable Management Hook
- PDU input lead cordsPrepare Factory-Installed PDUs
- cage nut
- Duosert, installingInstall a Filler Panel
- filler panelInstall a Filler Panel
- insertion toolInsert Cage Nuts Into Rail Holes
- installingInsert Cage Nuts Into Rail Holes
- caster dimensionsIdentifying
Rack Installations and Dimensions (Sun Rack II 1242)
- circuit breakersPower Off the Rack
- compliance guidelines
- Preparing for Rack Installation
- Safety Guidelines
and Cautions
- Rack Task
Installation Overview
D
- dimensions
- cable routingRear Cabling
Space (Sun Rack II 1042)
- castor locationsIdentifying
Rack Installations and Dimensions (Sun Rack II 1242)
- dynamic load, maximum
- 1042Sun Rack
II 1042 Weights
- 1242Sun Rack
II 1242 Weights
- floor
- cutout, 1042Cable Routing Holes
- cutout, 1240
- Floor Cutout Dimensions (Original Sun Rack II 1242)
- Floor Cutout
Dimensions (Enhanced Sun Rack II 1242)
- leveling feet locations
- Feet and
Caster Dimensions (Sun Rack II 1242)
- Identifying
Rack Installations and Dimensions (Sun Rack II 1242)
- Feet and
Caster Dimensions (Sun Rack II 1042)
- packagingPackaging
Dimensions
- RETMA rails
- Sun Rack
II 1242 Dimensions
- Sun Rack
II 1042 Dimensions
- weight
- empty, 1042Sun Rack
II 1042 Weights
- empty, 1242Sun Rack
II 1242 Weights
- maximum allowable, 1042Sun Rack
II 1042 Weights
- maximum allowable, 1242Sun Rack
II 1242 Weights
- doors
- installingInstall the Doors
- locksRemove the Doors
- removingRemove the Doors
- replacingInstall the Doors
- Duosert cage nuts, installingInstall a Filler Panel
- dynamic load, maximum
- 1042Sun Rack
II 1042 Weights
- 1242Sun Rack
II 1242 Weights
E
- earth ground cable attach point
- Attach a Grounding Cable for TT Power Systems
- Attach a Grounding Cable for TN Power Systems
- electrostatic discharge See ESD
- equipment
- cable
- management hooksInstall a Cable Management Hook
- traysInstall Third-Party Cable Trays
- cablingInstall a Cable Management Hook
- cage nuts, installingInsert Cage Nuts Into Rail Holes
- installation tasksEquipment
Installation Task Overview
- servicing
- procedureService Equipment in the Rack
- ESD
- antistatic wrist strap
- attachingAttach an Antistatic Wrist Strap
- requirementsESD Precautions
- ground jacksAttach an Antistatic Wrist Strap
- preventionESD Precautions
- requirementsESD Precautions
F
- filler panels
- airflow requirementsESD Precautions
- Duosert cage nuts, installingInstall a Filler Panel
- installing
- Install a Filler Panel
- Remove a Filler Panel
- floor loading capacity, maximumAccess Route
Guidelines
G
- grounding
- ground cable, attachingAttaching a Grounding Cable
- TN power systemsAttach a Grounding Cable for TN Power Systems
- TT power systemsAttach a Grounding Cable for TT Power Systems
- requirementsAccess Route
Guidelines
- grounding strap
- disconnectingDetach a Grounding Strap
- doorsRemove the Doors
- locating
- Servicing
Side Panels
- Detach a Grounding Strap
- PDUPrepare Factory-Installed PDUs
- quick-release connectorDetach a Grounding Strap
- side panelsRemove the Side Panels
- top panelRemove the Top Panel
- guidelines
- access routeAccess Route
Guidelines
- safetySafety Guidelines
and Cautions
- servicing equipment
- Preparing to Install or Service Equipment
- Preparing to Install or Service Equipment
I
- incline, maximumAccess Route
Guidelines
- installation
- cage nutsInsert Cage Nuts Into Rail Holes
- equipmentEquipment
Installation Task Overview
- moving to siteMove the Rack to the Installation
Site
- PDUInstalling PDUs
- preparing
- floor cutoutCable Routing Holes
- sitePreparing for Rack Installation
- safety guidelinesSafety Guidelines
and Cautions
- task overview
- Preparing for Rack Installation
- Confirming Specifications
- Understanding the Rack
- unpacking rackRack Packaging
K
- keys
- doorsRemove the Doors
- side panelsRemove the Side Panels
L
- leveling feet
- locationsIdentifying
Rack Installations and Dimensions (Sun Rack II 1242)
- stabilizing rackStabilize the Rack (Leveling
Feet)
- loading dock requirementsAccess Route
Guidelines
- locks
- doorsRemove the Doors
- side panelsInstall the Side Panels
M
- maintenance access requirements
- 1242Sun Rack
II 1042 Dimensions
- maintenance access requirements
- 1042Sun Rack
II 1042 Dimensions
- 1242Sun Rack
II 1242 Dimensions
- moving rackMove the Rack to the Installation
Site
P
- packaging
- dimensionsPackaging
Dimensions
- enterpriseRack Packaging
- dimensionsPackaging
Dimensions
- repackingRepack the Rack in the Enterprise Packaging
- repackingRepack the Rack in the Enterprise Packaging
- standardRack Packaging
- dimensions, 1042Packaging
Dimensions
- dimensions, 1242Packaging
Dimensions
- unpackingRack Packaging
- panel
- doorsRemove the Doors
- filler
- Install a Filler Panel
- Remove a Filler Panel
- side panelsRemove the Side Panels
- topServicing
the Top Panel
- PDU
- cable routing bracket, installingPrepare Factory-Installed PDUs
- circuit breakersPower Off the Rack
- factory installed
- grounding strap, attachingPrepare Factory-Installed PDUs
- preparingPrepare Factory-Installed PDUs
- shipping screws, removingPrepare Factory-Installed PDUs
- grounding strapPrepare Factory-Installed PDUs
- installationInstalling PDUs
- power input lead cords, routingPrepare Factory-Installed PDUs
- shipping brackets
- installingSecure the PDUs in the Rack
- removingPrepare Factory-Installed PDUs
- shipping screws, removingPrepare Factory-Installed PDUs
- power
- offPower Off the Rack
- onPower the Rack On
- requirementsAccess Route
Guidelines
- power distribution unit
- See PDU
- See PDU
- See PDU
R
- repacking enterprise packagingRepack the Rack in the Enterprise Packaging
- requirements
- airflow
- 1042Sun Rack
II 1042 Weights
- 1242Sun Rack
II 1242 Weights
- ESDESD Precautions
- groundingAccess Route
Guidelines
- loading dock height and rampAccess Route
Guidelines
- maintenance access
- 1042Sun Rack
II 1042 Dimensions
- 1242
- Sun Rack
II 1242 Dimensions
- Sun Rack
II 1042 Dimensions
- powerAccess Route
Guidelines
- RETMA rails
- adjustingAdjusting
the RETMA Rails
- frontAdjust the Front RETMA Rails
- rearAdjust the Rear RETMA Rails
- depth
- Sun Rack
II 1242 Dimensions
- Sun Rack
II 1042 Dimensions
- route
- cables through management hooksInstall a Cable Management Hook
- PDU power cordsPrepare Factory-Installed PDUs
S
- safety guidelines
- Preparing for Rack Installation
- Safety Guidelines
and Cautions
- Rack Task
Installation Overview
- servicing
- doorsServicing
Doors
- grounding strapsServicing Grounding Straps
- side panelsRemove the Side Panels
- top panelServicing
the Top Panel
- shipping
- brackets
- installingSecure the PDUs in the Rack
- removingPrepare Factory-Installed PDUs
- dimensionsPackaging
Dimensions
- screws
- installingSecure the PDUs in the Rack
- removingPrepare Factory-Installed PDUs
- shipping kit contents
- Tools Required
- Tools Required
- side panels
- installingInstall the Side Panels
- locksInstall the Side Panels
- removal toolRemove the Side Panels
- removingRemove the Side Panels
- replacingInstall the Side Panels
- site preparation
- floor cutoutCable Routing Holes
- dimensions, 1042Cable Routing Holes
- dimensions, 1240
- Floor Cutout Dimensions (Original Sun Rack II 1242)
- Floor Cutout
Dimensions (Enhanced Sun Rack II 1242)
- requirementsPreparing for Rack Installation
- spring nuts, installing
- Secure the PDUs in the Rack
- Install a Cable Management Hook
- stabilizing
- leveling feetStabilize the Rack (Leveling
Feet)
T
- tools
- cage nut insertion toolInsert Cage Nuts Into Rail Holes
- side panel removal toolRemove the Side Panels
- top
- panel
- installingInstall the Top Panel
- removingServicing
the Top Panel
- replacingInstall the Top Panel
- topic guidelines
- Returning the Rack to Operation
- Preparing to Install or Service Equipment
- Installing PDUs
- Installing the Rack
U
- unpacking rackRack Packaging
W
- weight
- empty
- 1042Sun Rack
II 1042 Weights
- 1242Sun Rack
II 1242 Weights
- maximum allowable
- 1042Sun Rack
II 1042 Weights
- 1242Sun Rack
II 1242 Weights