Go to main content

Sun Rack II User's Guide

Exit Print View

Updated: July 2018
 
 

Install Third-Party Cable Trays

Cable trays for routing cables out the top of the rack cabinet are not packaged with the rack. However, there are four threaded holes on the top of the rack where you can attach cable trays using M12 bolts.


Caution

Caution  - The standard packaging is designed solely for shipping an empty rack. Never install equipment in the rack while it is on this pallet, and never repack a rack in the standard packaging. If you must populate the rack prior to moving it to a new building or site, repack the rack in the enterprise packaging.


  • Attach cable trays to the rack.

    Use this illustration and the dimensions in this table to guide you.


    image:Figure showing the locations and dimensions of the top mounting holes.
    No.
    Description
    Metric
    U.S.
    1.
    Depth of the mounting holes
    871 mm (Sun Rack II 1042)
    1011 mm (Sun Rack II 1242)
    34.29 in. (Sun Rack II 1042)
    43.35 in. (Sun Rack II 1242)
    2.
    Width of mounting holes
    485 mm
    19.09 in.

    Caution

    Caution  - Do not attempt to use these four holes to lift the rack off the floor or pallet, because they do not support the weight of the rack.


Related Information