Six-Rack Cabling
The following table shows the cable connections for the first spine switch (R1-U1)
when cabling six full racks together.
Table 36 Leaf Switch Connections for the First Rack in a Six-Rack System
|
|
|
R1 U32 within Rack 1
|
R1-U32-P8A to R1-U1-P3A
R1-U32-P8B to R1-U1-P4A
|
3 meters
|
R1 U32 to Rack 2
|
R1-U32-P9A to R2-U1-P5A
R1-U32-P9B to R2-U1-P6A
|
5 meters
|
R1 U32 to Rack 3
|
R1-U32-P10A to R3-U1-P7A
|
5 meters
|
R1 U32 to Rack 4
|
R1-U32-P10B to R4-U1-P8A
|
10 meters
|
R1 U32 to Rack 5
|
R1-U32-P11A to R5-U1-P9A
|
10 meters
|
R1 U32 to Rack 6
|
R1-U32-P11B to R6-U1-P10A
|
10 meters
|
R1 U26 within Rack 1
|
R1-U26-P8A to R1-U1-P3B
R1-U26-P8B to R1-U1-P4B
|
3 meters
|
R1 U26 to Rack 2
|
R1-U26-P9A to R2-U1-P5B
R1-U26-P9B to R2-U1-P6B
|
5 meters
|
R1 U26 to Rack 3
|
R1-U26-P10A to R3-U1-P7B
|
5 meters
|
R1 U26 to Rack 4
|
R1-U26-P10B to R4-U1-P8B
|
10 meters
|
R1 U26 to Rack 5
|
R1-U26-P11A to R5-U1-P9B
|
10 meters
|
R1 U26 to Rack 6
|
R1-U26-P11B to R6-U1-P10B
|
10 meters
|
|
The following table shows the cable connections for the second spine switch (R2-U1)
when cabling six full racks together.
Table 37 Leaf Switch Connections for the Second Rack in a Six-Rack System
|
|
|
R2 U32 within Rack 2
|
R2-U32-P8A to R2-U1-P3A
R2-U32-P8B to R2-U1-P4A
|
3 meters
|
R2 U32 to Rack 1
|
R2-U32-P11B to R1-U1-P10A
|
5 meters
|
R2 U32 to Rack 3
|
R2-U32-P9A to R3-U1-P5A
R2-U32-P9B to R3-U1-P6A
|
5 meters
|
R2 U32 to Rack 4
|
R2-U32-P10A to R4-U1-P7A
|
5 meters
|
R2 U32 to Rack 5
|
R2-U32-P10B to R5-U1-P8A
|
10 meters
|
R2 U32 to Rack 6
|
R2-U32-P11Ato R6-U1-P9A
|
10 meters
|
R2 U26 within Rack 2
|
R2-U26-P8A to R2-U1-P3B
R2-U26-P8B to R2-U1-P4B
|
3 meters
|
R2 U26 to Rack 1
|
R2-U26-P11B to R1-U1-P10B
|
5 meters
|
R2 U26 to Rack 3
|
R2-U26-P9A to R3-U1-P5B
R2-U26-P9B to R3-U1-P6B
|
5 meters
|
R2 U26 to Rack 4
|
R2-U26-P10A to R4-U1-P7B
|
5 meters
|
R2 U26 to Rack 5
|
R2-U26-P10B to R5-U1-P8B
|
10 meters
|
R2 U26 to Rack 6
|
R2-U26-P11Ato R6-U1-P9B
|
10 meters
|
|
The following table shows the cable connections for the third spine switch (R3-U1)
when cabling six full racks together.
Table 38 Leaf Switch Connections for the Third Rack in a Six-Rack System
|
|
|
R3 U32 within Rack 3
|
R3-U32-P8A to R3-U1-P3A
R3-U32-P8B to R3-U1-P4A
|
3 meters
|
R3 U32 to Rack 1
|
R3-U32-P11A to R1-U1-P9A
|
5 meters
|
R3 U32 to Rack 2
|
R3-U32-P11B to R2-U1-P10A
|
5 meters
|
R3 U32 to Rack 4
|
R3-U32-P9A to R4-U1-P5A
R3-U32-P9B to R4-U1-P6A
|
5 meters
|
R3 U32 to Rack 5
|
R3-U32-P10A to R5-U1-P7A
|
5 meters
|
R3 U32 to Rack 6
|
R3-U32-P10B to R6-U1-P8A
|
5 meters
|
R3 U26 within Rack 3
|
R3-U26-P8A to R3-U1-P3B
R3-U26-P8B to R3-U1-P4B
|
3 meters
|
R3 U26 to Rack 1
|
R3-U26-P11A to R1-U1-P9B
|
5 meters
|
R3 U26 to Rack 2
|
R3-U26-P11B to R2-U1-P10B
|
5 meters
|
R3 U26 to Rack 4
|
R3-U26-P9A to R4-U1-P5B
R3-U26-P9B to R4-U1-P6B
|
5 meters
|
R3 U26 to Rack 5
|
R3-U26-P10A to R5-U1-P7B
|
5 meters
|
R3 U26 to Rack 6
|
R3-U26-P10B to R6-U1-P8B
|
5 meters
|
|
The following table shows the cable connections for the fourth spine switch (R4-U1)
when cabling six full racks together.
Table 39 Leaf Switch Connections for the Fourth Rack in a Six-Rack System
|
|
|
R4 U32 within Rack 4
|
R4-U32-P8A to R4-U1-P3A
R4-U32-P8B to R4-U1-P4A
|
3 meters
|
R4 U32 to Rack 1
|
R4-U32-P10B to R1-U1-P8A
|
10 meters
|
R4 U32 to Rack 2
|
R4-U32-P11A to R2-U1-P9A
|
5 meters
|
R4 U32 to Rack 3
|
R4-U32-P11B to R3-U1-P10A
|
5 meters
|
R4 U32 to Rack 5
|
R4-U32-P9A to R5-U1-P5A
R4-U32-P9B to R5-U1-P6A
|
5 meters
|
R4 U32 to Rack 6
|
R4-U32-P10A to R6-U1-P7A
|
5 meters
|
R4 U26 within Rack 4
|
R4-U26-P8A to R4-U1-P3B
R4-U26-P8B to R4-U1-P4B
|
3 meters
|
R4 U26 to Rack 1
|
R4-U26-P10B to R1-U1-P8B
|
10 meters
|
R4 U26 to Rack 2
|
R4-U26-P11A to R2-U1-P9B
|
5 meters
|
R4 U26 to Rack 3
|
R4-U26-P11B to R3-U1-P10B
|
5 meters
|
R4 U26 to Rack 5
|
R4-U26-P9A to R5-U1-P5B
R4-U26-P9B to R5-U1-P6B
|
5 meters
|
R4 U26 to Rack 6
|
R4-U26-P10A to R6-U1-P7B
|
5 meters
|
|
The following table shows the cable connections for the fifth spine switch (R5-U1)
when cabling six full racks together.
Table 40 Leaf Switch Connections for the Fifth Rack in a Six-Rack System
|
|
|
R5 U32 within Rack 5
|
R5-U32-P8A to R5-U1-P3A
R5-U32-P8B to R5-U1-P4A
|
3 meters
|
R5 U32 to Rack 1
|
R5-U32-P10A to R1-U1-P7A
|
10 meters
|
R5 U32 to Rack 2
|
R5-U32-P10B to R2-U1-P8A
|
10 meters
|
R5 U32 to Rack 3
|
R5-U32-P11A to R3-U1-P9A
|
5 meters
|
R5 U32 to Rack 4
|
R5-U32-P11B to R4-U1-P10A
|
5 meters
|
R5 U32 to Rack 6
|
R5-U32-P9A to R6-U1-P5A
R5-U32-P9B to R6-U1-P6A
|
5 meters
|
R5 U26 within Rack 5
|
R5-U26-P8A to R5-U1-P3B
R5-U26-P8B to R5-U1-P4B
|
3 meters
|
R5 U26 to Rack 1
|
R5-U26-P10A to R1-U1-P7B
|
10 meters
|
R5 U26 to Rack 2
|
R5-U26-P10B to R2-U1-P8B
|
10 meters
|
R5 U26 to Rack 3
|
R5-U26-P11A to R3-U1-P9B
|
5 meters
|
R5 U26 to Rack 4
|
R5-U26-P11B to R4-U1-P10B
|
5 meters
|
R5 U26 to Rack 6
|
R5-U26-P9A to R6-U1-P5B
R5-U26-P9B to R6-U1-P6B
|
5 meters
|
|
The following table shows the cable connections for the sixth spine switch (R6-U1)
when cabling six full racks together.
Table 41 Leaf Switch Connections for the Sixth Rack in a Six-Rack System
|
|
|
R6 U32 within Rack 6
|
R6-U32-P8A to R6-U1-P3A
R6-U32-P8B to R6-U1-P4A
|
3 meters
|
R6 U32 to Rack 1
|
R6-U32-P9A to R1-U1-P5A
R6-U32-P9B to R1-U1-P6A
|
10 meters
|
R6 U32 to Rack 2
|
R6-U32-P10A to R2-U1-P7A
|
10 meters
|
R6 U32 to Rack 3
|
R6-U32-P10B to R3-U1-P8A
|
5 meters
|
R6 U32 to Rack 4
|
R6-U32-P11A to R4-U1-P9A
|
5 meters
|
R6 U32 to Rack 5
|
R6-U32-P11B to R5-U1-P10A
|
5 meters
|
R6 U26 within Rack 6
|
R6-U26-P8A to R6-U1-P3B
R6-U26-P8B to R6-U1-P4B
|
3 meters
|
R6 U26 to Rack 2
|
R6-U26-P10A to R2-U1-P7B
|
10 meters
|
R6 U26 to Rack 1
|
R6-U26-P9A to R1-U1-P5B
R6-U26-P9B to R1-U1-P6B
|
10 meters
|
R6 U26 to Rack 3
|
R6-U26-P10B to R3-U1-P8B
|
5 meters
|
R6 U26 to Rack 4
|
R6-U26-P11A to R4-U1-P9B
|
5 meters
|
R6 U26 to Rack 5
|
R6-U26-P11B to R5-U1-P10B
|
5 meters
|
|