Three-Phase Power Distribution Unit Cabling

This topic contains tables that list the three-phase cabling from each PDU to the power supplies configured in each rack. The cables are terminated to PDU-A on the left, and routed to the right to enter CMA, and are bundled in groups of four.

Table 80  Three-Phase PDU Cabling for the Expansion Rack (Full Rack)
Rack Unit
PDU-A/PS-00
PDU-B/PS-01
Cable Length
U41
G5-6
G2-0
2 meters
U39
G5-3
G2-3
2 meters
U37
G5-0
G2-6
2 meters
U35
G4-6
G1-0
2 meters
U33
G4-4
G1-2
2 meters
U31
G4-2
G1-4
2 meters
U29
G3-6
G0-0
2 meters
U27
G3-5
G0-1
2 meters
U25
G3-3
G0-3
2 meters
U24
G3-1
G0-5
2 meters
U23
N/A
G5-0
included
U22
G2-5
G5-1
1 meter
U21
G3-0
G0-6
2 meters
U20
G2-4
G5-2
2 meters
U18
G2-2
G5-4
2 meters
U16
G1-6
G4-0
2 meters
U14
G2-0
G5-6
2 meters
U12
G1-4
G4-2
2 meters
U10
G1-2
G4-4
2 meters
U8
G1-0
G4-6
2 meters
U6
G0-6
G3-0
2 meters
U4
G0-4
G3-2
2 meters
U2
G0-2
G3-4
2 meters
U1
G0-0
G3-6
2 meters
Table 81  Three-Phase PDU Cabling for the Expansion Rack (Half Rack)
Rack Unit
PDU-A/PS-00
PDU-B/PS-01
Cable Length
U24
G3-1
G0-5
2 meters
U23
N/A
G5-0
included
U22
G2-5
G5-1
1 meter
U21
G3-0
G0-6
2 meters
U20
G2-4
G5-2
2 meters
U18
G2-2
G5-4
2 meters
U16
G1-6
G4-0
2 meters
U14
G2-0
G5-6
2 meters
U12
G1-4
G4-2
2 meters
U10
G1-2
G4-4
2 meters
U8
G1-0
G4-6
2 meters
U6
G0-6
G3-0
2 meters
U4
G0-4
G3-2
2 meters
U2
G0-2
G3-4
2 meters
U1
G0-0
G3-6
2 meters
Table 82  Three-Phase PDU Cabling for the Expansion Rack (Quarter Rack)
Rack Unit
PDU-A/PS-00
PDU-B/PS-01
Cable Length
U24
G3-1
G0-5
2 meters
U23
N/A
G5-0
included
U22
G2-5
G5-1
1 meter
U21
G3-0
G0-6
2 meters
U20
G2-4
G5-2
2 meters
U8
G1-0
G4-6
2 meters
U6
G0-6
G3-0
2 meters
U4
G0-4
G3-2
2 meters
U2
G0-2
G3-4
2 meters