Single-Phase PDU Cabling

If the rack uses single-phase AC power, connect the devices in the rack to the power distribution unit (PDU) as shown in the following table. Each device requires two power cords for redundant power.


Caution

Caution  - Turn off all PDU circuit breakers before connecting power cords to the PDU. Every socket group has a circuit breaker.


See Figure 31 for the locations of the PDU circuit breakers and for names of the PDU AC sockets.

Slot
PDU-A/PSU-0
(T5-8 AC0)
PDU-B/PSU-0
(T5-8 AC2)
PDU-A/PSU-1
(T5-8 AC1)
PDU-B/PSU-1
(T5-8 AC3)
To Device
U41
Group 5-6
Group 0-0
Exadata Storage Server No. 8 (Full Rack)
U39
Group 5-5
Group 0-1
Exadata Storage Server No. 7 (Full Rack)
U37
Group 5-4
Group 0-2
Exadata Storage Server No. 6 (Full Rack)
U35
Group 5-3
Group 0-3
Exadata Storage Server No. 5 (Full Rack)
U34
Group 5-2
Group 0-4
ZFS storage controller No. 2
U33
Group 5-1
Group 0-5
ZFS storage controller No. 1
U32
Group 5-0
Group 0-6
Sun Datacenter InfiniBand Switch 36 Leaf Switch No. 2
U28
Group 4-6
Group 1-0
Sun Disk Shelf
U27
Group 3-5
Group 2-1
Ethernet management switch
U26
Group 3-6
Group 2-0
Sun Datacenter InfiniBand Switch 36 Leaf Switch No. 1
U18
Group 3-7
Group 2-7
Group 4-7
Group 1-7
SPARC T5-8 No. 2
U10
Group 1-7
Group 4-7
Group 2-7
Group 3-7
SPARC T5-8 No. 1
U8
Group 0-4
Group 5-2
Exadata Storage Server No. 4
U6
Group 0-3
Group 5-3
Exadata Storage Server No. 3
U4
Group 0-2
Group 5-4
Exadata Storage Server No. 2
U2
Group 0-1
Group 5-5
Exadata Storage Server No. 1
U1
Group 0-0
Group 5-6
Sun Datacenter InfiniBand Switch 36 Spine Switch