Loading Dock and Receiving Area Requirements

Before the rack arrives, ensure that the receiving area is large enough for the shipping package.

If your loading dock meets the height and ramp requirements for a standard freight carrier truck, you can use a pallet jack to unload the rack. If the loading dock does not meet the requirements, provide a standard forklift or other means to unload the rack. Alternatively, you can request that the rack be shipped in a truck with a lift gate.

When the rack arrives, leave the rack in its shipping packaging until it arrives in its installation site.


Note - Acclimatization time: If the shipping package is very cold or hot, allow the packaging to stand unopened in the computer room or a similar environment to come to the same temperature as the computer room. Acclimatization might require up to 24 hours.