Power On the System

Power on the system in the reverse order of shutdown.

  1. Turn on both circuit breakers that provide power to the rack.

    The switches will power on, and the Exadata Storage Servers, SPARC T5-8 servers and the ZFS Storage Controllers will return to standby mode.

  2. Boot each ZFS Storage Controller.
  3. Boot each SPARC T5-8 server.
  4. Boot each Exadata Storage Server.