Go to main content

Oracle® SuperCluster M8 and SuperCluster M7 Installation Guide

Exit Print View

Updated: January 2019
 
 

Prepare the Site

  1. Ensure that there is enough space to accommodate each rack.

    See Physical Specifications (SuperCluster M8 and Expansion Rack).

  2. Provide required power for each rack.

    See Reviewing Power Requirements.

  3. Provide proper cooling for each rack.

    See Preparing for Cooling.

Related Information