Two-Rack
Cabling
This table shows the cable connections for the first spine
switch (R1-U1) when cabling two full racks together.
Table 30 Leaf Switch Connections for the First Rack in a Two-Rack
System
|
|
|
R1-U24 within Rack 1 |
R1-U24-P8A to R1-U1-P3A
R1-U24-P8B to R1-U1-P4A
R1-U24-P9A to R1-U1-P5A
R1-U24-P9B to R1-U1-P6A |
3m |
R1-U24 to Rack 2 |
R1-U24-P10A to R2-U1-P7A
R1-U24-P10B to R2-U1-P8A
R1-U24-P11A to R2-U1-P9A
R1-U24-P11B to R2-U1-P10A |
5m |
R1-U18 within Rack 1 |
R1-U18-P8A to R1-U1-P3B
R1-U18-P8B to R1-U1-P4B
R1-U18-P9A to R1-U1-P5B
R1-U18-P9B to R1-U1-P6B |
3m |
R1-U18 to Rack 2 |
R1-U18-P10A to R2-U1-P7B
R1-U18-P10B to R2-U1-P8B
R1-U18-P11A to R2-U1-P9B
R1-U18-P11B to R2-U1-P10B |
5m |
|
This table shows the cable connections for the second spine
switch (R2-U1) when cabling two full racks together.
Table 31 Leaf Switch Connections for the Second Rack in a Two-Rack
System
|
|
|
R2-U24 within Rack 2 |
R2-U24-P8A to R2-U1-P3A
R2-U24-P8B to R2-U1-P4A
R2-U24-P9A to R2-U1-P5A
R2-U24-P9B to R2-U1-P6A |
3m |
R2-U24 to Rack 1 |
R2-U24-P10A to R1-U1-P7A
R2-U24-P10B to R1-U1-P8A
R2-U24-P11A to R1-U1-P9A
R2-U24-P11B to R1-U1-P10A |
5m |
R2-U18 within Rack 2 |
R2-U18-P8A to R2-U1-P3B
R2-U18-P8B to R2-U1-P4B
R2-U18-P9A to R2-U1-P5B
R2-U18-P9B to R2-U1-P6B |
3m |
R2-U18 to Rack 1 |
R2-U18-P10A to R1-U1-P7B
R2-U18-P10B to R1-U1-P8B
R2-U18-P11A to R1-U1-P9B
R2-U18-P11B to R1-U1-P10B |
5m |
|