This section describes the tools and equipment you need to install the server:
A mechanical device capable of lifting 250 pounds.
Number 2 Phillips screwdriver
ESD mat and grounding strap
A system console device, such as one of the following:
Workstation
ASCII terminal
Terminal server
Patch panel connected to a terminal server
The following devices:
VGA monitor
USB keyboard
USB mouse