Go to main content
Oracle® ZFS Storage ZS5-ES Service Manual, Release OS8.6.x

Exit Print View

Updated: March 2017
 
 

Power On the Controller

As soon as the power cords are connected, standby power is applied and the green Power/OK status indicator on the controller front panel blinks. Depending on the configuration of the firmware, the system might boot. If it does not boot, follow this procedure.

Power on the controller by performing one of the following steps:

  • Press the Power button on the controller front panel.

  • Log in to the Oracle ILOM web interface, click Host Management → Power Control and select Power On from the Select Action list.

  • Log in to the Oracle ILOM command-line interface (CLI), and type the following command at the Oracle ILOM prompt:

    -> start /System

When the controller is powered on and the power-on self-test (POST) code checkpoint tests have completed, the green Power/OK status indicator on the front panel lights and remains lit.

Related Information