Returning the Controller to Operation
After replacing components inside of the controller, perform the procedures in
the following sections.
|
|
Learn about filler panels.
|
|
Install the controller top cover.
|
|
Remove antistatic measures.
|
|
Install the controller chassis into the rack.
|
|
Return the controller to the normal rack position.
|
|
Reconnecting data cables and power cords.
|
|
Power on the controller.
|
|
|