After servicing the system, reinstall it into the rack.
Caution - Deploy any rack anti-tilt mechanism before installing the server into the rack. |
Caution - The server weighs approximately 63 pounds (28.5 kg). Two people are required to carry the chassis and install it in the rack. |
Refer to Installing the Server Into a Rack in Oracle Server X6-2L Installation Guide for the installation instructions specific to your rackmount kit.
For installation instructions for the CMA, refer to Install the Cable Management Arm in Oracle Server X6-2L Installation Guide.