Are you starting a new troubleshooting session with this task?
-
Are any power supply LEDs on?
-
Check the power cords and supplied power, and correct as necessary.
Refer to the Oracle Fabric Interconnect F2-12 Installation Guide,
then return to Step 2.
-
Is a power supply amber Attention LED on?
-
Release the tab and unseat the faulted power supply, wait a minute, then
reseat the power supply and secure the tab.
-
Does the power supply Attention LED persist?
-
Is the green SP LED off?
-
Is a 1GBASE-T port or SFP+ port used for the network management
interface?
-
Is the port's Link LED on?
-
Does the Link LED flash on occasion?
-
Are you sure you know that the cabling is wired correctly with good cables
and firm connections?
-
Inspect and replace cabling as necessary.
Then return to Step 9.
-
Are you sure you know that the communication hardware (terminals, routers,
and switches) are fully functional?
-
Inspect and replace communication hardware as necessary.
Then return to Step 9.
-
Use new cabling and connect to a different 1GBASE-T port or SFP+ port.
Go to Step 9. If you arrive back at this step a second time, go
to Step 16.
-
Remove the faulted component and install a new component.
See Faulted Item Replaceable Components for links to service tasks.
-
Perform further diagnostics.
See Perform Additional Diagnostics at the Switch.