Go to main content

SPARC T5-8 Server Service Manual

Exit Print View

Updated: February 2019
 
 

Install a Power Supply

The power supply is a hot-service component that can be replaced by a customer.


Caution

Caution  - This procedure requires that you handle components that are sensitive to electrostatic discharge. This discharge can cause failure of server components.


  1. Open the latch on the replacement power supply, and align the power supply with the empty bay.
    image:Graphic showing how to align the power supply.
  2. Slide the power supply into the chassis.
  3. Press the lever against the power supply to fully seat the power supply in the server.
    image:Graphic showing how to lock the power supply.
  4. Verify the installation.

    See Verify the Power Supply.

Related Information