Oracle® InfiniBand Switch IS2-46 Installation Guide

Exit Print View

Updated: September 2016
 
 

Powering On the Switch

These topics describe how to power on the switch for the first time.

Description
Links
Retrieve the power cords and SER MGT cable.
Connect the serial management device.
Connect the power cords.
If you have a full-time SER MGT connection, install the air duct.
Power on the switch.
If you are not using DHCP-assigned IP addresses, log in to the service processor (SP) through the SER MGT connection.
Assign a static IP address to the SP
Assign a static IP address to the SCP
Log in to the SP again

Related Information