Powering On the Switch
These topics describe how to power on the switch for the first time.
|
|
Retrieve the power cords and SER MGT cable.
|
|
Connect the serial management device.
|
|
Connect the power cords.
|
|
If you have a full-time SER MGT connection, install the air
duct.
|
|
Power on the switch.
|
|
If you are not using DHCP-assigned IP addresses, log in to the service
processor (SP) through the SER MGT connection.
|
|
Assign a static IP address to the SP
|
|
Assign a static IP address to the SCP
|
|
Log in to the SP again
|
|
|