oracle home
Oracle
®
InfiniBand Switch IS2-46 Installation Guide
Exit Print View
Search Term
Search Scope:
This Document
Entire Library
» ...
Documentation Home
»
Oracle InfiniBand Switch IS2-46 Documentation ...
»
Oracle
®
InfiniBand Switch ...
Updated: September 2016
Oracle
®
InfiniBand Switch IS2-46 Installation Guide
Document Information
Using This Documentation
Product Documentation Library
Feedback
Understanding the Switch
Installation Task Overview
Switch Overview
Front Panel Components
Rear Panel Components
Confirming Specifications
Physical Specifications
Electrical Specifications
Environmental Specifications
Airflow Precautions
Rack Compatibility
Rack Precautions
Preparing for Installation
Shipping Kit
Record the MAC IDs
Assign IP Addresses to the SP and SCP Through DHCP
Handling Precautions
ESD Precautions
Installation Tools
Installing the Switch
Stabilize the Rack
Install the Switch Brackets
Assemble the Cable Management Extenders
Prepare the Air Duct Assembly
Install the Cage Nuts
Install the Rackmount Hardware
Route the Power Cords
Route the SER MGT Cable
Install the Switch
Install the CMB
Connecting Cables
Cable Requirements
Standard MT and PrizmMT Cables
Cable Precautions
Assemble the SFP+ Cables
Route the Cables
Connect the RJ-45 Ethernet Cables
Connect the PrizmMT Cables
Connect the SFP+ Cables
Secure Cables to the CMB
Powering On the Switch
Retrieve the Power Cords and SER MGT Cable
Connect the SER MGT Cable
Connect a Serial Management Device to the SER MGT Port
Connect the Power Cords
Install the Air Duct Assembly
Power On the Switch
Log In to the SP (SER MGT)
Assign a Static IP Address to the SP
Assign a Static IP Address to the SCP
Log In to the SP (Network Management)
Verifying Functionality
Verify LED Status
LED Status
Verify That the Switch Is Operational
Verify Connectivity
Log In to the Oracle Fabric Manager Interface
Log In to the Oracle Fabric OS Interface
Run the Oracle Fabric OS Configuration Wizard
Oracle Fabric OS Configuration Wizard Parameters
Glossary
Index
Index A
Index C
Index D
Index E
Index F
Index H
Index I
Index L
Index M
Index O
Index P
Index R
Index S
Index T
Index U
Index V
Language:
English
Oracle
®
InfiniBand Switch IS2-46 Installation Guide
September 2016
Prepare and install the InfiniBand Switch IS2-46 from Oracle.
Document Information
Using This Documentation
Product Documentation Library
Feedback
Understanding the Switch
Installation Task Overview
Switch Overview
Front Panel Components
Rear Panel Components
Confirming Specifications
Physical Specifications
Electrical Specifications
Environmental Specifications
Airflow Precautions
Rack Compatibility
Rack Precautions
Preparing for Installation
Shipping Kit
Record the MAC IDs
Assign IP Addresses to the SP and SCP Through DHCP
Handling Precautions
ESD Precautions
Installation Tools
Installing the Switch
Stabilize the Rack
Install the Switch Brackets
Assemble the Cable Management Extenders
Prepare the Air Duct Assembly
Install the Cage Nuts
Install the Rackmount Hardware
Route the Power Cords
Route the SER MGT Cable
Install the Switch
Install the CMB
Connecting Cables
Cable Requirements
Standard MT and PrizmMT Cables
Cable Precautions
Assemble the SFP+ Cables
Route the Cables
Connect the RJ-45 Ethernet Cables
Connect the PrizmMT Cables
Connect the SFP+ Cables
Secure Cables to the CMB
Powering On the Switch
Retrieve the Power Cords and SER MGT Cable
Connect the SER MGT Cable
Connect a Serial Management Device to the SER MGT Port
Connect the Power Cords
Install the Air Duct Assembly
Power On the Switch
Log In to the SP (SER MGT)
Assign a Static IP Address to the SP
Assign a Static IP Address to the SCP
Log In to the SP (Network Management)
Verifying Functionality
Verify LED Status
LED Status
Verify That the Switch Is Operational
Verify Connectivity
Log In to the Oracle Fabric Manager Interface
Log In to the Oracle Fabric OS Interface
Run the Oracle Fabric OS Configuration Wizard
Oracle Fabric OS Configuration Wizard Parameters
Glossary
Index
A
C
D
E
F
H
I
L
M
O
P
R
S
T
U
V