-
Identify the prerequisite and subsequent installation tasks that you must
perform in conjunction with this task.
See Installation Task Overview.
-
At the switch, observe the state of the various chassis and component
LEDs.
-
Chassis status LEDs
-
Power supply LEDs
-
Fan module LEDs
-
SFP+ receptacle LEDs
-
RJ-45 receptacle LEDs
Note -
If the power supply or fan module LEDs are lit, they can be seen through
the air duct assembly.
-
Compare the state of the LEDs to the status indicated.
See LED Status.
-
Verify that the switch is operating.
See Verify That the Switch Is Operational.