Go to main content

Oracle® MiniCluster S7-2 Installation Guide

Exit Print View

Updated: October 2021
 
 

Set Up MiniCluster

  1. Log in to the Install Administrator account with the new password.
  2. Click Login.

    The Welcome to MiniCluster Configuration Utility page appears.


    image:Figure showing the Welcome page.
  3. Click on the Next button at the bottom of the page.

    The System Setup page appears.


    image:Figure showing the System Setup page.
  4. Verify that you have downloaded and installed the MiniCluster component bundle onto both compute nodes.

    Certain steps in the remaining initial configuration process will fail if you have not installed the MiniCluster component bundle on both compute nodes. See Transfer and Install the MiniCluster Component Bundle for more information.

  5. Locate the first step that needs to be run and click the Run button, or click the Run All Steps button.

    As part of the process in Perform Initial Configuration, you went through Steps 1 to 10 using the installmc tool. So those steps should be shown as Finished in the Status column.

    Complete the remaining steps in this System Setup page, either by clicking the Run button for each step, or by clicking the Run All Steps button. Clicking the Run All Steps button will begin the process after the last completed step (in this case, after Step 10). It normally takes about 3 to 4 hours to run all of the remaining steps in this page. Click Hide Detail to provide less detail or Show Detail to provide more detail for all of the steps that are run on this screen.

    This table lists the remaining steps from the System Setup page and what happens in each step. For each step, the following actions are valid:

    • Run — Runs this particular step.

    • Cancel — If this step is running, you can cancel the process by clicking this button.

    Number
    Step
    11
    Check configuration and IP mappings
    12
    Configure Oracle ILOM network
    13
    Storage: Create storage alias, reset JBODs & partition all disks in all JBODs
    14
    Calibrate all disks in all JBODs
    15
    Shared storage setup: Configure & secure kernel zones
    16
    Shared storage setup: Install Oracle Grid Infrastructure 12c in kernel zones
    17
    Shared storage setup: Apply GI PSU
    18
    Shared storage setup: Configure ACFS & mount the shared file system in global zones
    19
    Apply global zones security settings
  6. When all the steps have run successfully, click the appropriate button.
    • To verify that all the steps were run successfully, click the Verify All Steps button. All of the System Setup steps are rerun and verified.

    • To continue to the next procedure, click the Continue button. The Create Profile page appears.

  7. (Optional) Create a database virtual machine group as part of this initial installation.

    Go to Creating a Database Virtual Machine Group (Initial Installation).