Go to main content

Oracle® MiniCluster S7-2 Installation Guide

Exit Print View

Updated: October 2021
 
 

Power On the Storage Array

  1. Push the on/off switches on the power supplies to the on (I) position.

    Powering on can take several minutes.


    image:Figure showing the location of the power connectors and                                 switches on the storage array.
    1
    Power connectors
    2
    Power switches
  2. Ensure that the system Power LED on the front of the storage array is lit a steady green, and that each Fan Module LED on the rear of the power supplies is lit a steady green.

Related Information