Installing the MiniCluster
»
Installing the Compute Node
»
Install AC Power Cables and Slide-Rails
Updated: October 2021
Oracle
®
MiniCluster S7-2 Installation Guide
Document Information
Using This Documentation
Product Documentation Library
Feedback
Installation and Configuration Checklists
Pre-Installation Checklist
Hardware Installation and Cabling Checklist
Software Configuration Checklist
Preliminary Tasks
Initial Configuration Tasks
Using the Initial Configuration Tool
Bring Up Initial Configuration Tool
Provide General Configuration Information
Provide Management Network Configuration Information
Provide Client Network Configuration Information
Provide Remaining Configuration Information
Generate IP Mapping Information for DNS
Without Using the Initial Configuration Tool
Download the MiniCluster Component Bundle
Understanding the MiniCluster
Understanding the Compute Node
Overview (Compute Node)
Front Panel Components (Compute Node)
Rear Panel Components (Compute Node)
Understanding the Storage Array
Front Panel Components (Storage Array)
Rear Panel Components (Storage Array)
HDD/SSD Drives (Storage Array)
Confirming Specifications
Confirming Specifications (Compute Node)
Physical Specifications (Compute Node)
Electrical Specifications (Compute Node)
Environmental Specifications (Compute Node)
Airflow Precautions (Compute Node)
Confirming Specifications (Storage Array)
Physical Specifications (Storage Array)
Electrical Specifications (Storage Array)
Environmental Specifications (Storage Array)
Airflow Precautions (Storage Array)
Preparing for Installation
Preparing to Install the Compute Node
Shipping Kit (Compute Node)
Handling Precautions (Compute Node)
ESD Precautions (Compute Node)
Installation Tools (Compute Node)
Preparing to Install the Storage Array
Precautions (Storage Array)
Installation Tools (Storage Array)
Installing the MiniCluster
Stabilizing the Rack
Rack Compatibility
Rack Cautions
Stabilize the Rack
Installing the Compute Node
Install the Rackmount Hardware
Mark the Rackmount Location
Install AC Power Cables and Slide-Rails
Attach Tool-less Slide-Rail Assemblies
Install the Compute Node Into the Slide-Rail Assemblies
Install the Cable Management Arm
Remove the Cable Management Arm
Installing the Storage Array
Install the Rail Kit
Install the Storage Array in the Rack
Connecting Cables
Identifying Ports (Compute Node)
USB Ports
SER MGT Port
NET MGT Port
Gigabit Ethernet Ports
SAS Ports (Compute Node)
SAS Ports (Storage Array)
Understanding MiniCluster Connections
Connect the Management Network
Connect the 10GbE Client Access Network
Connect to the 10GbE Client Access Network Through 10GbE NIC
Connect to the 10GbE Client Access Network Through NET 2/NET 3 Ports
Connect the 10GbE Private Network
Connect the Base Storage Array to the Compute Nodes
Connect Additional Storage Arrays to the Compute Nodes
Connect the SER MGT Cable
Powering On MiniCluster for the First Time
Connect the Power Cords
Oracle ILOM System Console (Compute Node)
Power On MiniCluster
Power On the Storage Array
Power On the Compute Nodes for the First Time
Configuring the MiniCluster
Software Configuration Overview
Assign a Static IP Address to the NET MGT Port
Log In To Compute Node 1 (Oracle ILOM)
Copy Configuration Files to Compute Node 1
Perform Initial Configuration
(If Needed) Download and Install the MiniCluster Core Software
Transfer and Install the MiniCluster Component Bundle
Log In To the MCMU BUI for the First Time
Create the Install Administrator Account
Approve the New Install Administrator Account
Finish Setting Up the Install Administrator Account
Finish Setting Up the Supervisor Account
Set Up MiniCluster
Creating a Database Virtual Machine Group (Initial Installation)
Understanding the Database Virtual Machine Group
Database Virtual Machine Group Profile Overview
Database Virtual Machine Group Overview
Virtual Machines Overview
Clusters Overview
Database Home Overview
Database Instance Overview
Single Database Instance Example
RAC or RAC-One Node Database Instance Example
Create a Database Virtual Machine Group Profile
Deploy a Database Virtual Machine Group
Create a Database Home
Create a Database Instance
Creating an Application Virtual Machine Group (Initial Installation)
Understanding Application Virtual Machine Groups
Application Virtual Machine Group Overview
Virtual Machines Overview
Create an Application Virtual Machine Group
Performing Post-Installation Configurations
Configure the Oracle Engineered System Hardware Manager Password
Configure the mctuner Notification Email Address
Index
Index Numbers and Symbols
Index A
Index C
Index D
Index E
Index H
Index I
Index M
Index N
Index P
Index R
Index S
Index U
Language:
English
Install AC Power Cables and Slide-Rails
Prior to installing the slide-rails into the rack, install right-angle AC power cables into the left-side and right-side PDU electrical sockets for the servers you are going to rack mount.
Install the slide-rails into the rack.
See
Attach Tool-less Slide-Rail Assemblies
.
Attach the tool-less slide-rail assemblies.
See
Attach Tool-less Slide-Rail Assemblies
.